Wednesday, February 18, 2009
Kite repair on a Cabrinha leading edge
Two shots of this repaired Cabrinha leading edge. The vertical stitching in this shot is the factory stitching. The straight stitching and the triple step zig zag that runs along the main closure seam is ours. This is how we think a blown out leading edge should look after it's been reinforced and sewn closed again.
Subscribe to:
Post Comments (Atom)
Yeah, looks good!
ReplyDeleteRobert